UW Bothell Campus Retro-Commissioning

University of Washington - Bothell, WA

This project consisted of retro-commissioning of two five-year-old educational buildings, totaling approximately 178,000 SF of occupied space.

Mechanical related acoustical, comfort and control issues had plagued these two buildings since they were built.

We provided mechanical and acoustical field-testing, engineering analysis and recommendations.

Lynnwood Hall

Edmonds Community College Lynnwood Hall

DLR Group - Edmonds, WA

The Lynwood Hall 2nd floor remodel included approximately 16,000 SF of conditioned space.

Commissioning activities include installation verification, functional performance testing, training verification, commissioning documentation and post occupancy test preparation.

Systems to be commissioned include HVAC and related control systems, domestic hot water, and automatic lighting and day-lighting control systems.

UW Merrill Hall

UW Merrill Hall (Urban Horticulture)

Univeristy of Washington - Seattle, Washington

This project included trouble shooting and retro-commissioning for laboratory fume exhaust fans.

We collaborated with EH&S and CPO to develop solutions for sound issues related to fan selection.

The project included documenting the fume exhaust system including hoods, ductwork, bypass ducts, main ducts and fans, developing recommendations and providing engineering and construction support.

UW Wilcox Hall

UW Wilcox Hall

University of Washington - Seattle, WA

Our engineers authored a commissioning plan for systems to be tested, including installation and start-up checklists, functional and performance test procedures.

We coordinated commissioning activities with the Contractor and witnessed functional and performance testing of all systems.

When performance testing was completed, we authored a commissioning report which included a recommendation of acceptance.

Edmonds Community College Brier Hall

Edmonds Community College Brier Hall

State of Washington - Edmonds, WA

Our engineers provided installation verification, functional performance testing, training verification, commissioning documentation and post occupancy test preparation.

Systems commissioned included HVAC and related control systems, domestic hot water, and automatic lighting and day-lighting control systems.