12th Avenue Arts, Community Roots Housing

Home » Delivery Method » Design-Bid-Build » Page 2 12th Avenue Arts, Community Roots Housing (formerly Capitol Hill Housing) The 12th Avenue Arts project (Community Roots Housing), is a unique mixed-use complex consisting of street level retail/restaurant space, four floors (88 units) of affordable work-force apartments, second floor non-profit office space, two performing arts venues,…

Read More

Monroe School District, Frank Wagner Elementary School Renovation

Home » Delivery Method » Design-Bid-Build » Page 2 Monroe School District, Frank Wagner Elementary School Renovation Located on a 10.3 acre campus, the 29,800 SF addition/modernization brought improved functionality and renewed long-term use for this beloved school. The project includes a new, two-story instructional facility that features open classrooms, library addition, and indoor corridor…

Read More

Snoqualmie Valley School District, Mount Si High School Replacement

Home » Delivery Method » Design-Bid-Build » Page 2 Snoqualmie Valley School District, Mount Si High School Replacement The new high school was completed in 2 phases and features three-stories and four buildings that accommodate 2,300 students, grades 9 – 12. Programming emphasizes a STEM-based curricula. Opened Fall 2019, the school creatively incorporates a design…

Read More

North Thurston Public Schools, Salish Middle School

Home » Delivery Method » Design-Bid-Build » Page 2 North Thurston Public Schools, Salish Middle School This two-story school was designed to meet the needs for long-term space flexibility and functionality. Prominent is the Commons, an expansive, central gathering space that forms the heart of the school and features a large screen and projection system…

Read More

Seattle Public Schools, Hazel Wolf K-8 STEM School

Home » Delivery Method » Design-Bid-Build » Page 2 Seattle Public Schools, Hazel Wolf K-8 STEM School As part of the Building Excellence IV Levy, Seattle Public Schools replaced the old, Pinehurst School, with a contemporary, modern building that houses the Hazel Wolf K-8 program. Opened in September 2016, the school emphasizes studies of the…

Read More

Ship Canal Water Quality Project

Home » Delivery Method » Design-Bid-Build » Page 2 Ship Canal Water Quality Project The Ship Canal Water Quality Program (SCWQP), a shared program between Seattle Public Utilities and King County, will reduce the amount of combined sewer overflows into nearby waterways. The 18’ 10”, 2.7 mile underground storage tunnel will prevent up to 75…

Read More