Western State Hospital Campus Building 29 Forensic Ward Renovation
Modernization of Western State Hospital's Building 29 Wings E3 & E4, to forensic wards including patient, interview, exam, group, therapy, dining, and activity rooms. While preserving systems that could be reused, Greenbusch supported the design team/owner providing: Engineering predesign study; defined mechanical scope of work and cost estimates inclusive of ancillary power, utility and mechanical upgrade requirements; performed final design to LEED Silver standards.
Acoustic recommendations including: 1) Construction necessary to provide adequate sound isolation throughout various rooms; 2) To control crosstalk between spaces; 3) Performance specification for durable surface finishes to control noise and reverberation throughout; and 4) Recommendations for silencing of duct born fan noise and control of noise generated by mechanical systems within the building.
Services
Mechanical Engineering,
Acoustical Design
Location
Lakewood, WA
PROJECT SIZE
$11 million
27,000 SF
CLIENT
NAC Architecture
Delivery Method
Design-Bid-Build
Similar Experience
Western State Hospital Elevators in Three Buildings, Western State Hospital Building 29 TRC