Fire Station 22
Home » Delivery Method » Page 2 Fire Station 22 The new $13 million, 10,000 SF station is a two-story, steel-framed structure with updated systems, decontamination clean room and storage for major disaster supplies. It houses the E22 Engine Company as well as the department’s Incident Command Unit. As subconsultant to Weinstein A+U, Greenbusch provided…
Read MoreSound Transit University Link Extension
Home » Delivery Method » Page 2 Sound Transit University Link Extension The 3.15-mile University Link Light Rail line, completed in 2016, extended transit service from Downtown Seattle to the new underground Capitol Hill Station and ended at the new University of Washington Station located adjacent to Husky Stadium. A complex civil engineering and substantial,…
Read MoreWSDOT SR-99 North/South Portal Operations Buildings
Home » Delivery Method » Page 2 WSDOT SR-99 North/South Portal Operations Buildings As Acoustical subconsultant, Greenbusch was involved with preparation of the RFP technical requirements and preliminary design for the WSDOT SR 99 North/South Portal Operations Buildings that support WSDOT’s SR 99 Tunnel. Scope elements include ventilation system, jet fans, maintenance fans, building mechanical…
Read MoreWSDOT SR 99 Bored Tunnel Design-Build
Home » Delivery Method » Page 2 WSDOT SR 99 Bored Tunnel Design-Build Greenbusch provided Construction Noise monitoring for the duration of the building of the SR 99 Tunnel that replaced the Alaskan Way Viaduct. Scope elements included permitting and design-related support for the construction noise aspects of the project that opened February 2019. The…
Read MoreWSDOT SR-99 Alaskan Way Viaduct Demolition
Home » Delivery Method » Page 2 WSDOT SR-99 Alaskan Way Viaduct Demolition With opening of the new, SR 99 Tunnel, demolition of the SR 99 Alaskan Way Viaduct moved forward on February 12, 2019. Phased removal of the 66-year old, double-deck, elevated highway involved an extensive combination of heavy equipment including cranes with huge…
Read MoreColman Dock Ferry Terminal Renovation
Home » Delivery Method » Page 2 Colman Dock Ferry Terminal Renovation Colman Dock is the largest ferry terminal in the state, and is currently undergoing a significant facility renovation to address seismic concerns. The new terminal replaces old areas of the ferry terminal, reconfigures the layout, replaces aged piles, features a new entry building,…
Read More