Skagway Ore Peninsula Redevelopment Project
The Skagway Ore Peninsula Redevelopment Project, located in the remote town of Skagway in southeast Alaska, included demolition of existing docks and mooring structures, removal of ore loading equipment, and construction of a new dock with five new mooring dolphins. Three of the new dolphins were constructed in water over 100 feet deep.
The Greenbusch Group monitored underwater and in-air sound levels during the removal of 14-inch, 24-inch, and 36-inch diameter pipe piles with a variety of vibratory hammers. Installation of 24-inch, 36-inch, 42-inch, and 48-inch diameter pipe piles with vibratory and diesel impact hammers was also measured. Underwater sound levels were measured simultaneously at two locations, 30 feet from the pile and at a distance equal to three times the water depth at the pile location. Several of the piles were nearly 300 feet long and were driven in water approximately 150 feet deep. A total of 28 piles were monitored, and staff spent 27 days in Skagway.
With temperatures dipping to as low as -27 degrees Fahrenheit, special care was given to maintaining the minimum operating temperatures of the monitoring equipment (and monitoring staff). Because of the project’s remote location, monitoring staff would frequently need to carry the equipment approximately 1 mile to and from the site each day. Pile driving also occurred in multiple work areas each day, requiring the equipment to be portable and flexible. Monitoring equipment included custom hydrophone enclosures and cables, and recording equipment capable of simultaneous multichannel measurements. Recording equipment was able to be divided into distinct measurement systems to make single channel measurements at different locations to allow for data collection several hundred feet from the pile.
Read MoreLincoln High School Replacement
Home » Services Lincoln High School Replacement Greenbusch provided Acoustical Design and Vertical Transportation consulting services for this new, LEED Gold high school. A six-story urban “high-rise” building designed to accommodate a growing student population, the facility includes specialized classrooms for 2D and 3D fine arts, adjacent flex spaces, STEM labs, and a maker space.…
Read MoreJordan Valley Water Conservancy District Blower Room Sound Abatement
Home » Services Jordan Valley Water Conservancy District Blower Room Sound Abatement Greenbusch provided recommendations for reducing blower sound levels in office and lab spaces above the Blower Room at the Jordan Valley Water Purification Plant. Staff measured sound and vibration levels generated by air scour blowers installed on Level 1 received by office and…
Read MoreMonroe School District, Park Place Middle School
Home » Services Monroe School District, Park Place Middle School The modernized, 128,000 sf school emphasizes open learning and joint instructional classroom teaching and was built in two phases allowing students to attend school while under construction. Greenbusch designed mechanical systems feature: High-efficiency variable speed motors; Outside air is controlled by CO2 sensors so that…
Read MoreCentral City Concern Blackburn Building
Home » Services Central City Concern Blackburn Building Central City Concern (CCC), a nonprofit founded in 1979, serves adults and families in the Portland area experiencing homelessness, poverty, and addiction. Opened in July 2019, the six-story Blackburn Building uniquely combines a 40,000 SF outpatient clinic space and 152 units of affordable housing. The health center…
Read MoreUniversity of Washington Foster School Founders Hall
Home » Services University of Washington Foster School Founders Hall The UW Foster School of Business Founders Hall Building, currently in design/construction, will be a mix of instructional, academic and administrative spaces to include classrooms, offices, team and meeting rooms, workshop space, and large common areas, serving the Foster School PhD Program, the Center for…
Read More